The Ghana Grid Company Ltd (GRIDCo) awarded to Tractebel Engineering the study of a ten year (2010-2020) Transmission System Development Master Plan.This study aims at defining the future investments over the planning horizon
The objective of the study is to review the transmission system development as defined by SEC for the short-term (2010) up to the mid-term (2020).
GET SUPPORT |
Get support from power systems experts
|
|
GET TECHNICAL ANDCOMMERCIAL INFORMATIONS |
More informations about the software can be obtained using the information request form |
|