Saudi Arabia-GCCIA- Update of Installed Capacity Study (2010)

The objective of the study is to review and update parts of the GCC Electrical Interconnection Feasibility Study related to the benefits of the interconnection.

The installed capacity obligations for each Member State will be calculated and the Study will report the installed capacity savings in each Member State thanks to the interconnection.

  