UAE - System study in relation with the upgrade of Taweelah Power Plant (2002-2003)

 

The objective of this project was to evaluate the impact of the new extension of the Taweelah power plant on the network operation and defence plan of Abu Dhabi.

The following aspects have been investigated :
Load-Flow and short-circuit analysis

  • U/Q Control
  • Small Signal & Transient Stability
  • P/F control and operating reserve policy
  • Review of Under Frequency Load Shedding.

 