eurostag

Home > Publications > Power System Development & Economics

Power System Development & Economics

 

 

 

 Date

 Type Title of communications
Conference/Journal Authors
 Revue_E_KBVE_SRBE_SMALL.png  2010  

 

Aspects systématiques du raccordement des centrales de production au réseau

 

Revue E - 126ème année - N°2-2010 K. Karoui (Tractebel Engineering)
 pic23_F_CIGRE_SMALL.jpg  2003  Interconnection

 

Realization of the East-West interconnection project should be started with a full-scale experiment

 

 

CIGRE Conference for Synchronous Operation of the East-West Interconnection in Europe – St. Petersburg, 17 -19 Sept. 2003

 

 

A.Grobovoy(PSECL)-A. Rabotin(Siberian ISO)-N. Lizalek (Siberian Electric Power Research Institute)-M.Stubbe(Tractebel Engineering)-A.Germond(EPFL)

 

 pic23_F_CIGRE_SMALL.jpg

 2002

Operational Planning

 

Advanced perspectives and implementation of dynamic security assessment in the open market environment

  

CIGRE Paris, Session 2002

 Ref.39-101 ©Cigré

 

A. Bihain(Tractebel Engineering)-

G. Burt(Strathclyde University)-.Casamatta(CESI)-

T.Koronides(HTSO)-

R. Lopez(Alstom T&D)-S.Massucco (Univ. Genova)-

D. Ruiz-Vega(Univ. Liège)-

C. Vournas(ICCS/NTUA)

 

 pic23_F_CIGRE_SMALL.jpg  2000

 

Operational Planning

 

 

Réglage Coordonné de la Tension, Expérience en Belgique

 

CIGRE Paris, Session 2000

Ref. 38-111 ©Cigré

 

J. Deuse,F. Promel(Tractebel Engineering)-

J. Van Hecke, N. Janssens(CPTE)

 

 pic23_F_CIGRE_SMALL.jpg  2000

 

Operational Planning

 

 

Coordinated Voltage Control Experience in Belgium

 

CIGRE Paris, Session 2000

Ref. 38-111 ©Cigré

 

J. Deuse,F. Promel(Tractebel Engineering)-

J. Van Hecke, N. Janssens(CPTE)

 

 pic23_F_CIGRE_SMALL.jpg  1998

 

Operational Planning

 

 

Centralized Voltage Control : a Key Point for Optimal Operation of Power Systems

 

CIGRE Paris, Session 1998

Ref. 39-116 ©Cigré

 

P. Panciatici

F. Bena

P. Pruvot(EDF)

N. Janssens(CPTE)

J. Deuse

M. Stubbe(Tractebel Engineering)

 

 ieee_logo_SMALL.jpg  1995

 

Operational Planning

 

Panel Session on Long Term Stability

 

Presented at the IEEE Summer Meeting 1995, Power Engineering Society

 

 M. Stubbe
 pic23_F_CIGRE_SMALL.jpg  1988  

Operational Planning

 

 

Simulation du Comportement Dynamique des Réseaux Electriques à Court et Long Termes

 

CIGRE Paris, Session 1988, Groupe 38-03

M. Stubbe

A. Bihain

J. Deuse

J.C. Baader

 pic23_F_CIGRE_SMALL.jpg  1988

 

Operational Planning

 

 

Simulation of the Dynamic Behaviour of Electrical Power Systems in the Short and Long Terms

 

CIGRE, Paris, Session 1988, Groupe 38-03

M. Stubbe

A. Bihain

J. Deuse

J.C. Baader

 pic23_F_CIGRE_SMALL.jpg  1987  Master Plans Planning against Voltage Collapse

 

CIGRE, Groupe 38.01-03, ELECTRA n°111, pp. 59-75

 

 

JF. Christensen, AW. Gainger, G. Santagostino, M. Stubbe and J. Verseille

 

 pic23_F_CIGRE_SMALL.jpg  1987 Master Plans

 

Planification pour éviter un écroulement de tension

 

CIGRE, Groupe 38.01-03, ELECTRA n°111, pp. 59-75

 

JF. Christensen, AW. Gainger, G. Santagostino, M. Stubbe and J. Verseille

 

 pic23_F_CIGRE_SMALL.jpg  1980 Master Plans

 

Research on the Optimal Size of Equipments for an Electric Network with Multi-Voltage Levels. Its Application in a Study on the Effect of Lost Energy Cost

 

CIGRE Paris,Session 1980, Groupe 31-03  

P. Douillez

M. Stubbe

 pic23_F_CIGRE_SMALL.jpg  1980 Master Plans

 

Recherche de la Taille Optimale des Equipements d’un Réseau Electrique à plusieurs Plans de Tension. Application à une Etude de l’Influence du Coût des Pertes d’Energie 

CIGRE Paris,Session 1980, Groupe 31-03

P. Douillez

M. Stubbe