
| Date | Type | Title of communications | Conference/Journal | Authors | |
![]() | 2010 |
Aspects systématiques du raccordement des centrales de production au réseau
| Revue E - 126ème année - N°2-2010 | K. Karoui (Tractebel Engineering) | |
| | 2003 | Interconnection |
Realization of the East-West interconnection project should be started with a full-scale experiment
|
|
A.Grobovoy(PSECL)-A. Rabotin(Siberian ISO)-N. Lizalek (Siberian Electric Power Research Institute)-M.Stubbe(Tractebel Engineering)-A.Germond(EPFL)
|
| | 2002 | Operational Planning |
Advanced perspectives and implementation of dynamic security assessment in the open market environment
|
A. Bihain(Tractebel Engineering)- G. Burt(Strathclyde University)-.Casamatta(CESI)- T.Koronides(HTSO)- R. Lopez(Alstom T&D)-S.Massucco (Univ. Genova)- D. Ruiz-Vega(Univ. Liège)- C. Vournas(ICCS/NTUA)
| |
| | 2000 |
Operational Planning
|
Réglage Coordonné de la Tension, Expérience en Belgique
|
J. Deuse,F. Promel(Tractebel Engineering)- J. Van Hecke, N. Janssens(CPTE)
| |
| | 2000 |
Operational Planning
|
Coordinated Voltage Control Experience in Belgium
| J. Deuse,F. Promel(Tractebel Engineering)- J. Van Hecke, N. Janssens(CPTE)
| |
| | 1998 |
Operational Planning
|
Centralized Voltage Control : a Key Point for Optimal Operation of Power Systems
|
P. Panciatici F. Bena P. Pruvot(EDF) N. Janssens(CPTE) J. Deuse M. Stubbe(Tractebel Engineering)
| |
![]() | 1995 |
Operational Planning
| Panel Session on Long Term Stability |
Presented at the IEEE Summer Meeting 1995, Power Engineering Society
| M. Stubbe |
| | 1988 | Operational Planning
|
Simulation du Comportement Dynamique des Réseaux Electriques à Court et Long Termes
| CIGRE Paris, Session 1988, Groupe 38-03 | M. Stubbe A. Bihain J. Deuse J.C. Baader |
| | 1988 |
Operational Planning
|
Simulation of the Dynamic Behaviour of Electrical Power Systems in the Short and Long Terms
| CIGRE, Paris, Session 1988, Groupe 38-03 | M. Stubbe A. Bihain J. Deuse J.C. Baader |
| | 1987 | Master Plans | Planning against Voltage Collapse |
CIGRE, Groupe 38.01-03, ELECTRA n°111, pp. 59-75
|
JF. Christensen, AW. Gainger, G. Santagostino, M. Stubbe and J. Verseille
|
| | 1987 | Master Plans |
Planification pour éviter un écroulement de tension
| CIGRE, Groupe 38.01-03, ELECTRA n°111, pp. 59-75 |
JF. Christensen, AW. Gainger, G. Santagostino, M. Stubbe and J. Verseille
|
| | 1980 | Master Plans |
Research on the Optimal Size of Equipments for an Electric Network with Multi-Voltage Levels. Its Application in a Study on the Effect of Lost Energy Cost
| CIGRE Paris,Session 1980, Groupe 31-03 | P. Douillez M. Stubbe |
| | 1980 | Master Plans |
Recherche de la Taille Optimale des Equipements d’un Réseau Electrique à plusieurs Plans de Tension. Application à une Etude de l’Influence du Coût des Pertes d’Energie | CIGRE Paris,Session 1980, Groupe 31-03 | P. Douillez M. Stubbe |